To search, Click below search items.

 

All Published Papers Search Service

Title

Designing Scheduling Problem in Continuous Production System in Two-Level Supply Chain

Author

Seyyed Mohammad Hadji Molana1, iman nematollahi

Citation

Vol. 26  No. 2  pp. 113-122

Abstract

Production schedule in a supply chain is found to be the most important inventory control and supply chain management which has been ignored so far. In today's world most of the products needed by applicants, due to their nature usually has a high production volume and diversity by a group of technology and cellular manufacturing method is performed. If the timing is not appropriate in a cell production system, the semi-finished products during the manufacturing cost can be enormous. These costs include the cost of storage and the cost of destroying them. Also, many customers are interested in that issue the order until the moment of delivery, spend less time waiting. It seems also important for production managers. Because of timing and delivery in the shortest time in addition to reducing maintenance costs increase the level of customer satisfaction. In this study, the question of the timing of the two-level system integration with supply chain is examined. Producers have the cell production system due to the nature of the system, a machine with speed and features are different. The customer demand in each period and must be fully met. The timing of production must be done in such a way that the parts are in the form of continuous production.

Keywords

Supply chain, cell production, and scheduling, continuous production

URL

http://paper.ijcsns.org/07_book/202602/20260213.pdf